Non-notifiable Scaffolding

This course will give people the skills and knowledge to work safely and erect non-notifiable prefabricated scaffolding up to five metres in height.

  • Location:
    Available nationally
  • Method of Study:
    Short courses
  • Dates:
    Multiple intakes per year (please enquire)
  • Enquire for more information

Core elements

  • Demonstrate knowledge of non-notifiable prefabricated scaffolding
  • Erect, alter, inspect and dismantle completed non-notifiable prefabricated frame scaffolding
  • Undertake and implement a task analysis for the erection, use and dismantling of non-notifiable prefabricated frame scaffolding

Unit Standards in this course include:

  • US 9184 Erect and dismantle non-notifiable prefabricated frame scaffolding up to five metres in height
  • US 13016 Demonstrate knowledge of the erection and dismantling of scaffolding up to five metres in height
  • US 13053 Erect and dismantle scaffolding up to five metres in height

Meets DoL Guidance Notes for Working at Heights.

Entry Criteria

  • Be 16 years of age or over.
  • Applicants for whom English is a second language must meet IELTS (or equivalent) Level 5.5

Note: This course requires specific levels of physical ability and aptitude for working at heights.

Disclaimer

This is a Safety Sensitive Programme